Integrated VRV HVAC and Ventilation Systems Delivered at Colchester Bus Depot

Integrated VRV HVAC and Ventilation Systems Delivered at Colchester Bus Depot

Friday, February 6, 2026 | Air Conditioning

Adcock is pleased to continue its long-standing partnership with Horizon Construction Ltd, supporting the delivery of a major HVAC installation at the Colchester Bus Depot, a collaboration that builds on our relationship established in 2015.

The project includes the supply, installation and commissioning of advanced HVAC systems across the ground, first, second and third floors. The solution features exposed ducted indoor units to suit the open-plan environment, integrated ventilation systems designed to meet required occupancy air-change rates and independent cooling units serving comms rooms on each level. A centralised touch-screen controller provides global system management, including scheduled control of the toilet extract system.

To support the project’s sustainability objectives, Adcock has installed a Daikin VRV system that meets the required BREEAM Pol-01 credit criteria, incorporating heat-recovery technology to improve energy efficiency and reduce operational carbon impact. As a Daikin D1+ Premium and Decarbonisation Partner, Adcock continues to deliver high-performance, future-ready building solutions for our clients.

We are proud to support Horizon Construction Ltd in delivering another high-quality, energy-efficient facility.

Sign Up To Our Newsletter

Get monthly “Airmail” straight to your inbox. Sign up today to receive your first issue.
You can opt out at any time.

Thank you for subscribing to our newsletter